Tile Factory at FIEDMC M3
All projects
Industrial · Industry

Tile Factory at FIEDMC M3

Tile plant with kiln, pressing hall, and high bay warehouse under a single connected envelope.

Location
FIEDMC M3, Faisalabad
Category
Industry

Isolated kiln plinths, pressing hall floor, high bay warehouse, connected envelope with movement joints.

What the client was up against.

A tile manufacturing plant inside the M3 industrial city needed kiln foundations capable of repeated thermal cycling, a pressing hall floor with tight flatness, and a high bay warehouse, all on one connected footprint.

Options on the table.

01

Split the building into separate independent sheds.

02

Deliver a single connected envelope with engineered movement joints.

03

Lease and retrofit an existing shed in the same industrial estate.

What Tameer delivered.

A connected envelope with engineered movement joints between the kiln line, pressing hall, and warehouse, plus isolated heavy concrete plinths under each kiln to absorb cyclic load. The pressing hall floor was specified for the flatness the press equipment required.

The outcome.

A factory that runs as one continuous flow from raw material to packed pallets, with kiln plinths and the pressing hall floor sized to the equipment loads.

Have a project like this one?

Tell us about the brief. We will come back with the constraints, the trade offs, and a route through.