PEL Unit-2
All projects
Industrial · Industry

PEL Unit-2

Second production unit for PEL's white goods line, built for future line reconfiguration.

Client
Pak Elektron Limited (PEL)
Location
Lahore
Category
Industry

Steel portal frame, insulated cladding, RCC plinth, overhead services rack, hard floor.

What the client was up against.

PEL needed a second production unit to absorb growing demand for white goods while keeping its existing plant running. The new shed had to accept future assembly line reconfiguration without structural changes.

Options on the table.

01

Replicate the original shed bay for bay.

02

Engineer a longer clear span for line flexibility.

03

Use a mixed RCC and steel hybrid to balance cost and span.

What Tameer delivered.

A wide span steel portal frame with insulated metal panel cladding on a reinforced concrete plinth. Internal services were routed in an overhead rack so the floor stays clear for future line changes. Earthworks, foundations, frame, cladding, and ground level finishes ran as a single critical path.

The outcome.

A production envelope that gives PEL a free clear floor for assembly line work and headroom for future reconfiguration.

Have a project like this one?

Tell us about the brief. We will come back with the constraints, the trade offs, and a route through.